Project Process Flow

Ideation

  • Industrial Design concept creation
  • Trade off analysis of cost effective components
  • Refinement of look and feel
  • The scope of the ideation phase is determined by the complexity of the product. Complex products require significant work.  Less complex products my be completed quickly
  • Mechanical Design
  • Electrical Design
  • Software Development
  • Creation of product Technical Data Package- The TDP is normally done in Solid Works
  • Select vendors for manufacturing. In some cases we conduct factory audits for clients to determine manufacturing capability.
  • Determine equipment needed for production
  • Determine hard tooling requirements and cost for development of these tools
  • Calculate cost of materials and purchase parts to build product
  • Estimate labor required to make product
  • Provide cost analysis to customer
  • Establish quality performance standards
  • Determine harmonizing code and duty
  • Calculate cube and weight for shipping analysis
  • Determine regulatory approval process e.g. UL. FDA, Energy Star, etc.
  • Conduct material analysis, e.g. type of plastic to be used, grade of steel or aluminum,
  • Build prototype
  • Test prototype to determine what works and what does not work
  • Make changes to design based on testing
  • Design plastic injection mold tooling
  • Design Rotational mold tooling
  • Design casting tooling
  • Design stamping tooling
  • Machine components for tooling production
  • Produce tooling as required
  • Prepare operators instructions and literature
  • Develop packaging
  • Establish process for Engineering Change Control
  • On-site production readiness review
  • Build sufficient units for real world testing
  • Verify product against required standards
  • Modify design based on lessons learned
  • Set up manufacturing production line
  • Establish assembly guidelines
  • Print users manuals and instruction sheets
  • Make Packaging
  • Conduct first article evaluation
  • Make modification as necessary based on testing
  • Ship goods to from factory to fulfillment or distribution center
  • Ship goods on behalf of customer to buyers
  • Responsibility of Markus Group clients